home page | site map | türkçe
 
 
 
 
 
 
Andritz : 2 powerhouse cranes with 250 T capacity

Turbine assembly work has been started in Ilısu Dam in Mardin, using the 2 powerhouse cranes with 250 T capacity built for Andritz. The cranes work in tandem during the assembly of turbine rotor and stator parts, with the heaviest piece being approximately 500 tons.


Başkent Organize Sanayi Bölgesi 4. Cadde No: 3, 06909 Temelli, Malıköy, Ankara • Tel: (312) 640 14 21 • Faks: (312) 640 14 27 • e-mail: info@isikmuh.com.tr
Web Design: AdaNET